The delivery according to the project includes: ladders, operating platforms, railings, flanges and pipe branches, access holes and other design elements.
Tank installation is carried out on a pre-ready concrete base. Fastening to the foundation is carried out by anchor bolts, joint is sealed. Tank dimensions are calculated according to geological research, site location and other individual factors.
Subject to snow and wind impact and compliance with safety measures in case of close location to other industrial structures, above-ground or combined (partially buried) installation is possible.
Multi-module tanks, with coupling joints and capacity of more than 200m3 and up to the volume required by the project, ensure reliability and high performance. Typical or individual designs of such tanks are used depending on the expected operating conditions. Considering the foundation design, location, volume and other characteristics, each huge tank is of a unique design.